Artemis Interiors were appointed to carry out the extensive refurbishment of Burleigh House, 385 The Strand in London’s West End. The works included the stripping out of 4 of the 6 storeys of the building including Ground, First, Second and Fifth floors. In addition a new external terrace was formed at roof level which involved the extension of the two existing staircases to reach roof level, this required major structural design in order to remove sections of the existing roof slab and form new Staircase Pop-up’s.
The Office Floor works entailed the complete strip out and fitting out of the Ground Floor reception area as well as 3 of the 5 Office Floors to a Cat A+ standard including new lighting & lighting control systems, new main MVHR plant and equipment, tea points, refurbishment and re-development of the existing WC facilities, end of journey facilities within the basement level and a complete re-model of the Ground Floor Reception Area along with refurbishment and up-grading of the lift car finishes.
The building remained tenanted on two levels throughout the project works so maintenance of existing services at all times was critical to prevent disruption and ensure that all facilities remained live for the tenants.