We were appointed to undertake the CAT A fit out to 1st, 2nd and 3rd floors over 2 phases.
The 3rd floor was split to allow for two tenants to take up occupancy at completion of the CAT A fit out. The 1st and 2nd floors were not separated, but future proofed with separation in mind.
Works included a complete strip out of the existing fit out, construction of separating wall to create the lobby area, which incorporated plasterboard ceiling, non structural columns, surrounding lifts and a door set on either side. The replacement of fan coil units, new LED lighting, newceiling, new raised floor, redecoration throughout and full refurbishment to WC’s on all 3 floors.